Skymaster Forum  

Go Back   Skymaster Forum > Messages
Register FAQ Members List Calendar Today's Posts

 
 
Thread Tools Rating: Thread Rating: 841 votes, 4.99 average. Display Modes
Prev Previous Post   Next Post Next
  #24  
Unread 03-29-10, 09:32 AM
WebMaster's Avatar
WebMaster WebMaster is offline
Web Master
 
Join Date: Apr 2002
Location: Cleveland, OH
Posts: 1,524
WebMaster is on a distinguished road
Several IA's

Nick,
Several people were involved in the review and cost estimates of SID compliance.

Removing both wings from the fuselage is a labor intensive project. Re-assembling them is even more labor intensive. In between, there is the eddy current inspection of each of the attach points, in the fuselage, and the wing. In addition to the wing removal, there are several other items that must be inspected. The cost is real. You may have a lower labor rate, and get eddy current inspection at a lower cost, but the total cost will significant. In addition, there is the very real possibility that the re-assembly will damage the aircraft.

That is why SOAPA has campaigned to have the wing attach inspection removed from the SID inspection.
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump


All times are GMT -4. The time now is 08:05 AM.


Powered by vBulletin® Version 3.6.9
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.