|
Register | FAQ | Members List | Calendar | Today's Posts | Search |
|
Thread Tools | Rate Thread | Display Modes |
#1
|
|||
|
|||
help / rollers on control column P version
Skyking, GMAS
There was a thread earlier on the UNO board covering the replacement of the rubber rollers at the instrument panel (3) / guides for the control column. did you mention about machining nylon rollers to fit over the bearings? Last week I found the rubber sleeve on the floor and on the co-pilots side there are two out of three missing. Guess the cost from Cessna or Yingling is rather high. Can you please resend the solution. Did you say you had some left over for sale ? Tnx Bob Last edited by Bob Cook : 05-12-02 at 08:42 AM. |