Thanks Fred. It looks like the tail will rest on the structure immediately around the tiedown, rather than the tiedown ring itself, because the pipe will touch first. Am I correct, or confused? I take it this area is strong enough to take the load? (Hope the question makes sense.) Very good picture, thanks!
Kevin
|